TESTING
KNDS Greece has the capability to perform operational tests for the assembled component groups.
For the requirements of the LEO2 HEL project our company has procured the necessary equipment. So after assembly operational tests are performed for the power unit (motor-gear box) and the road wheel arms of each vehicle.
These tests are carried out by personnel trained in Germany.